Time at which the correcting variable runs through the correcting range at the maximum considered correcting speed (DIN 19 226).
Fluidlexikon
Time at which the correcting variable runs through the correcting range at the maximum considered correcting speed (DIN 19 226).
HAWE Finland Oy
Koskelontie 15
FIN-02920 Espoo
Suomi
Puhelin: +358 10 82126-00
sales (at) hawe.fi