Time that would be necessary to reach an agreed value for the task or controlled variable if its max. rate of change from the initial value of the output variable to the agreed value were to remain effective (DIN 19 226).
Fluidlexikon
Time that would be necessary to reach an agreed value for the task or controlled variable if its max. rate of change from the initial value of the output variable to the agreed value were to remain effective (DIN 19 226).
HAWE Hydraulik SE
Einsteinring 17
85609 Aschheim/München
Germany
Phone: +49 89 379100-1000
info (at) hawe.de