Time that is required for a sudden change in the operation pressure with a pre-defined deviation to settle.
Fluidlexikon
Time that is required for a sudden change in the operation pressure with a pre-defined deviation to settle.
HAWE Hidraulica, S.L.U.
P.I. Almeda, c/ Progrés, 139-141
08940 Cornellá del Llobregat
Barcelona
Telf: +34 93 4751370
hawe.hidraulica (at) hawe.es