Time at which the correcting variable runs through the correcting range at the maximum considered correcting speed (DIN 19 226).
Fluidlexikon
Time at which the correcting variable runs through the correcting range at the maximum considered correcting speed (DIN 19 226).
HAWEジャパン株式会社
〒454-0825
名古屋市中川区好本町2-2
Phone: +81 52 365-1655
info (at) hawe.co.jp